GIDROELEKTROSTANSIYALARNING MRP/PRP PROTOKOLLARI VA OPC UA ASOSIDA SIL 2 VA IEC 62443 TALABLARIGA MOS ZAXIRALANGAN AVTOMATLASHTIRILGAN BOSHQARUV TIZIMI ARXITEKTURASI

Najmiddinov S. T. & Madaminov N. Z.


Annotatsiya

Maqolada o‘rta quvvatli gidroelektrostansiyalar uchun mo‘ljallangan zaxiralangan avtomatlashtirilgan boshqaruv tizimi arxitekturasi taqdim etilgan: dala darajasida MRP, dispetcherlik darajasida PRP protokollari, hamda TLS 1.2 ustidan X.509 sertifikatlari bilan o‘zaro autentifikatsiyalanuvchi OPC UA orqali himoyalangan ma’lumot almashinuvi qo‘llanilgan. ISA-95 modeliga muvofiq uch darajali yechim IEC 61508 bo‘yicha SIL 2 funksional xavfsizlikni va IEC 62443 bo‘yicha kiberxavfsizlikni ta’minlaydi. TIA Portal v17 muhitida o‘tkazilgan modellashtirish halqaning 200 ms dan kam vaqtda qayta tiklanishini va PRP almashinuvida paketlar yo‘qotilmasligini tasdiqladi, Purdue modeli bo‘yicha DMZ bilan segmentatsiya esa kiber-hujumlar yuzasini taxminan 90 % ga qisqartiradi.


Adabiyotlar

  1. International Energy Agency. Hydropower Special Market Report. — Paris: IEA, 2023. — 124 p.
  2. World Bank. Hydropower Modernization: Case Studies and Lessons Learned. — Washington: World Bank Group, 2022. — 96 p.
  3. Najmiddinov Sh. T., Madaminov N. Z., Ismoilov O. M. Review of practices, evaluation of economic benefits and understanding of technical problems in the modernization of existing hydropower plants // Bulletin of TIIAME. — 2024. — No. 2. — P. 45–52.
  4. Vannoni E., et al. Digital Transformation in Hydropower Plants // Renewable Energy Journal. — 2023. — Vol. 198. — P. 314–328.
  5. IRENA. Innovation Landscape for Hydropower. — Abu Dhabi: IRENA, 2022. — 88 p.
  6. Stouffer K., Pillitteri V., Lightman S., et al. Guide to Industrial Control Systems (ICS) Security: NIST SP 800-82 Rev. 3. — Gaithersburg: NIST, 2023. — 314 p.
  7. IEC 62439-2:2021. Industrial communication networks — High availability automation networks — Part 2: Media Redundancy Protocol (MRP). — Geneva: IEC, 2021.
  8. IEC 62439-3:2021. Industrial communication networks — High availability automation networks — Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR). — Geneva: IEC, 2021.
  9. IEC 62541-1:2020. OPC Unified Architecture — Part 1: Overview and concepts. — Geneva: IEC, 2020.
  10. IEC 62443-3-3:2013. Industrial communication networks — Network and system security — Part 3-3: System security requirements and security levels. — Geneva: IEC, 2013.
  11. IEC 61508-1:2010. Functional safety of electrical/electronic/programmable electronic safety-related systems — Part 1: General requirements. — Geneva: IEC, 2010.
  12. Siemens AG. SIMATIC S7-1500/ET 200MP System Manual. — Nürnberg: Siemens, 2023. — 1842 p.
  13. Siemens AG. SIMATIC PCS 7 System Description: Process control with WinCC and TIA Portal. — Nürnberg: Siemens, 2022.
  14. Knapp E. D., Langill J. T. Industrial Network Security: Securing Critical Infrastructure Networks for Smart Grid, SCADA, and Other Industrial Control Systems, 2nd ed. — Waltham: Syngress, 2015. — 460 p.
  15. Hydro-Québec. Annual Report 2022: Operations and Innovation. — Montréal: Hydro-Québec, 2023. — 134 p.
  16. Itaipu Binacional. Cybersecurity Architecture of the Itaipu Hydropower Plant: Technical Brief. — Foz do Iguaçu: Itaipu, 2021. — 28 p.
  17. Galloway B., Hancke G. P. Introduction to Industrial Control Networks // IEEE Communications Surveys & Tutorials. — 2013. — Vol. 15, No. 2. — P. 860–880.
  18. ISA-101.01-2015. Human Machine Interfaces for Process Automation Systems. — Research Triangle Park: ISA, 2015.
  19. ISA-18.2-2016. Management of Alarm Systems for the Process Industries. — Research Triangle Park: ISA, 2016.
  20. Rakhmonov R., Karimov A. Modernization prospects of small hydropower plants in Uzbekistan // Uzbek Journal of Energy. — 2023. — No. 4. — P. 18–26.